Welcome to: W Stirland Ltd

If you have selected the mobile or non-css viewing style by mistake, please select this link to jump back to the default view and start again.

W Stirland > Projects > Education > Chichester High School for Boys

Chichester High School for Boys Chichester, West Sussex

Chichester High School for Boys Images

Project Brief

Procured together with Chichester-based architects HNW, via a design competition held by West Sussex County Council.

The project was the design and build of a new three-storey arts, drama and teaching building, as well as the refurbishment of the school's cafeteria located on the their Kingsham Road campus.

The main building featured brickwork elevations with aluminium windows and a flat roof.

Project Team

Architect:   HNW
Engineer:   Gyoury Self LLP
Client Agent:  Baqus Group PLC

Project Description

W Stirland was responsible for developing and completing the detailed design from Stage B during the pre-construction period, including undertaking all necessary site surveys.

The project entailed the construction of ten new general teaching classrooms, the refurbishment and conversion of two existing classrooms into IT suites, one drama space, one new multi-purpose changing room, two music classrooms and six music practice rooms.

The works also included the upgrade of the existing school hall, two group/SEN classrooms and six office spaces and the refurbishment of the design technology workshop, food technology rooms, toilets and storage areas.

Chichester High School for Boys Images

Client
West Sussex County Council

Contract Value
£3.2 million

Duration
44 weeks

Sector
Education

Procurement Route
Design Competition

Form of Contract
JCT 2011 Design and Build

Completed
August 2014

Chichester High School for Boys Image

Want to get in touch?