Welcome to: W Stirland Ltd

If you have selected the mobile or non-css viewing style by mistake, please select this link to jump back to the default view and start again.

W Stirland > News > W. Stirland are pleased to have been appointed to Design & Build the last remaining site available on the Southern Gate Office Village in Chichester.

W. Stirland are pleased to have been appointed to Design & Build the last remaining site available on the Southern Gate Office Village in Chichester.

W. Stirland are pleased to have been appointed to Design & Build the last remaining site available on the Southern Gate Office Village in Chichester. Images

W. Stirland are pleased to have been appointed to Design & Build the last remaining site available on the Southern Gate Office Village in Chichester.

Block B - Southern Gate Office Village will comprise a total of 1,395 sq m (15,015 sq ft) of high quality space and will provide a terrace of three individual, three storey B1 office units each of 465 sq m (5,005 sq ft). This desirable Grade A office space will be completed to a high standard and will benefit from both on site parking and excellent transport links. The specification includes:

• Gas powered heating system to radiators

• Vertical sliding sash double glazed windows

• Raised floors

• Air conditioning

• Hydraulic passenger lift

• 34 parking spaces

Elevations courtesy of The Seaman Partnership Limited

Want to get in touch?