W. Stirland has built an enviable reputation for producing highly sustainable school buildings for a variety of private and public sector clients.

Be it higher or further education, secondary school, primary school or independent school we have the expertise you seek.

At least 50% of our workload at any one time is in the education sector. This can range from a small primary school extension to a large halls of residence at a university.

We are a framework contractor with Hampshire County Council and West Sussex County Council and work with Surrey County Council on their 'Schools Expansion Programme'.

Oathall Community College, Haywards Heath

Originally constructed in 1974 under the SCoLA school building programme, the SAM building was, by modern standards, uncomfortable to work in, expensive to maintain and suffered from layout and accessibility issues. The rebuilding programme included asbestos removal, the installation of thermal insulation, external cladding in Etnernit Cedral lap weatherboarding... Continue Reading »

SCoLA Schools Recladding and Refurbishment

All four schools have been fully-functioning during the works with two or more temporary classrooms being installed on each site.  Separation of staff, pupils and public from the works, and secure routes in and out of the building were re-arranged for each phase/area of works.  Accurate programming has been essential to... Continue Reading »

Purbrook Park School

Such a comprehensive project required critical planning and careful co-ordination. The build process spanned two academic years, enabling the school to function fully throughout. These new facilities needed to embrace the school’s architectural heritage, and as D&B Contractor we had to be sympathetic to the original building designed by the... Continue Reading »

The Glebe Primary School

The works to the school included the extension of buildings at a number of locations across the campus, including; Area A: Hall, classrooms, group rooms and WCs Area B: Classrooms, group rooms, library, reception and WCs Area C: Head Teacher, offices and waiting area There was also an extension to the Year 6 buildings, extensions... Continue Reading »

Linden Education Centre

The existing school building is 861m2 and was the subject of extensive internal alterations. The new 2-storey extension added 742m2 to the floor area. Both buildings, the new and the old, house classrooms and specialist teaching and staff rooms. The extension was constructed using a cross laminated timber system clad in... Continue Reading »

Bohunt School

The new building occupies the site of two redundant tennis courts. The roof of the building is twin pitch with insulated composite profiled colour-coated metal sheeting. External elevations, in the main, are of brickwork and weatherboarding. The building also features black aluminium curtain-walling to match the colour of the... Continue Reading »

Iford & Kingston Primary School

The works consisted of a four-classroom extension, hall extension including PE store room, an extension to form a new office and interview room and external covered area, and refurbished areas including WCs. These new areas have replaced the existing mobile classrooms previously in use on site. The school... Continue Reading »

Warden Park Primary Academy

The project comprised new classroom extensions, associated group rooms, the extension of the hall, provision for a specialist practical room; two group rooms and a CDT room including associated store. External works included upgrading pathways, the construction of a new car park, upgrading existing entrances and permanent crossover. There is... Continue Reading »

Prior's Field School

Working with the novated Architect and Engineer, the three-phased development saw the new Music Science & Technology building completed in the time for the new academic year in 2016, with the remainder completed by the end of January 2017. The new three-storey building of circa 1800m2 is traditional in appearance... Continue Reading »

Worplesdon Primary School

The project was divided into four phases: 1 - Car park, temporary WC/store and hall screens 2 - New Classroom block 3 - Hall Extension 4 - Remove Modular Classrooms The two-storey new build classroom block has a flat roof with facing brick and aluminium curtain-walling elevations. The main structure is a steel frame... Continue Reading »

St Andrews CE High School for Boys

The works consisted of two new buildings, a performing arts block and main entrance and a design technology block along with extra parking. The school sits at the heart of a residential area bound to the south by Sackville Road, to the west by Garrick Road and the north by... Continue Reading »

Davison CE High School for Girls

The scope included a large three-storey extension providing nine general teaching classrooms, ICT Room, science lab and prep room, music room and art room. Non-teaching accommodation includes SEN facilities, three music practice rooms, a new dining hall, offices and a staff room. Elevations are of brick and render with aluminium... Continue Reading »

Chesswood Middle School

In addition to various areas that were refurbished and adapted a large extension was also built to provide 12 Classrooms and four group rooms. Elevations are a mixture of brick and coloured render with aluminium windows and doors and a standing seam roof. A new multi-purpose hall was created... Continue Reading »

Goring First CE School

The works involved the construction of seven new classrooms, a new hall, new cloakroom space and toilets, and the relocation and refurbishment of the library, staffroom and office. All works were completed on a live school campus. Continue Reading »

Barns Green Primary School

The works involved the demolition of the old Itchingfield Primary School and the design and build of a new school which was carried out in the following phases: Section 1: The design and construction of a new  school building and associated external works. Section 2: The demolition of the existing building,... Continue Reading »

St Paul's Catholic College

The project consisted of the construction of  three new general teaching classrooms, locker space & storage, the realigning of access road to adjacent car park and associated external works. The new classrooms were formally opened at a special ceremony on the 18th June. Continue Reading »

Edward Bryant Primary School

This is one of many projects undertaken for West Sussex County Council over numerous years. Edward Bryant School has been provided with new classrooms and a new two-court sports hall with climbing bars and a specialist sprung floor. The new buildings were constructed on an extremely tight site between the... Continue Reading »

Chichester High School for Boys

W Stirland was responsible for developing and completing the detailed design from Stage B during the pre-construction period, including undertaking all necessary site surveys. The project entailed the construction of ten new general teaching classrooms, the refurbishment and conversion of two existing classrooms into IT suites, one drama space, one... Continue Reading »

Edwardian Building, Halls of Residence

The main structure of the new building is traditionally built, with extensive block and brick walls. Precast planks form the new floors which are linked by precast stair units. The new facilities comprise en-suite bedrooms, kitchens, living areas and common rooms. Each single study/bedroom has an en-suite shower room... Continue Reading »

Woodlands Meed College

The project was carried out in three phases, and involved the complete refurbishment of the 1500m² school including complex needs pastoral and high dependency units. The building has been constructed of structural timber posts with insulated timber infill panels; externally the building has Trespa rain screen cladding with Fermacell internal lining. Continue Reading »

Bolnore Primary School

W. Stirland was responsible for developing and completing the detailed design from Stage C during the pre-construction period, including undertaking necessary surveys, etc and the construction of the new build two-storey extension. The project consisting of six new classrooms, two wet rooms, three breakout areas, a group room, a flexible... Continue Reading »

Imberhorne School

The works comprised the construction of a 4-court sports hall with associated stores, viewing area, changing rooms, dedicated disabled changing provisions, office for sports staff, toilets, two classrooms and multi-purpose hall. The steel-framed building is supported on mass concrete foundations, with screeds, (other than in main sports hall), beam and... Continue Reading »

Frant Primary School

Built in just 35 weeks this project was completed 3 months earlier than if it had been constructed using traditional building methods. The building achieved an A rating EPC, a BREEAM “Excellent” rating and a Carbon Reduction of 60% over Building Regulations with the use of only minimal renewable technology. The... Continue Reading »

The Phoenix Centre

The works entailed the construction of a new community facility incorporating a learning resource centre, sports/activity hall, recording studios, sensory room, full kitchen and café area. The Phoenix Centre is a combination of youth centre, performance space, Connexions information, advice and guidance centre, young people’s healthy living centre, language and cultural... Continue Reading »

Seaford College Halls of Residence

Seaford College appointed us to obtain planning permission, provide cost planning services and design and construct the new buildings. This was part of a wider-ranging appointment, the scope of which included the master planning of the school campus and obtaining planning permission for a number of residential units that... Continue Reading »

Shoreham College

W Stirland was responsible for construction and completion of three elements of new works at Shoreham College, comprising: A two-classroom extension to the existing junior school arrangement A two-storey Design and Technology building The refurbishment of the old Design Technology classrooms 17, 17a and 17b, including all services, associated external works and... Continue Reading »

Manhood Sports Centre

Manhood Community College is now an academy in the public sector and as such is independent of the Local Authority. The school was once the second smallest high school in West Sussex. It is now known as The Academy, Selsey. In addition to the sports hall there is a full... Continue Reading »

Ditcham Park School

The new sports hall, now known as The Martin Pryce Building, occupied a remote site on the school campus. The large steel-framed structure has an adjacent two-storey building containing the changing rooms and ancillary accommodation. The external elevations use a mixture of brickwork and hardwood cladding with a feature profile... Continue Reading »

UoC Multi Purpose Centre

The building provides the University's Student Union with their own offices and a function facility. Whilst modest in size, the buildings mechanical and ventilation design was highly complex. Designed to be used as a nightclub, the building has a ventilation system capable of moving huge volumes of air in a... Continue Reading »

UoC Student Accommodation

Constructed in the heart of the university campus the management of pedestrians was a significant challenge. The project entailed the demolition of the existing two storey accommodation buildings and construction of this new Halls of Residence in three separate buildings. Continue Reading »

Boundstone Community College

The project comprised the construction of a new arts and drama building for the school. The site was located adjacent to the existing school gym and next to the playground. Pupils entered the campus using the school access road and this was also our own entrance. Careful segregation of... Continue Reading »

Walberton and Binsted School

W. Stirland Limited was responsible for the full design and construction of the building. The design of the building enables low-tech solutions to ventilation, heating and cooling systems resulting in very low running costs. The building achieved a “Very Good” Breeam rating as well as having Secure by Design certification. The completed... Continue Reading »

Herbert Shiner School

The objective of West Sussex County Council was to refurbish the existing school in phases, and construct a new primary school attached to the existing building. Working within the occupied school presented many challenges in terms of co-ordinating our activities around the school’s day-to-day operations - all of which were... Continue Reading »

Seaford College

The new building comprised 8 classrooms, preparation areas, toilets and a staff area within the Seaford College Campus. The structure was designed to be traditional in appearance, with a pitched tiled roof and external elevations featuring a mixture of brickwork and flint-faced blocks. Continue Reading »

Westbourne House School

The construction of a new School Assembly Hall provided practice rooms, a stage, changing facilities, toilets and an entrance lobby. The building is of steel-frame construction, clad in brickwork and stone, with powder-coated aluminium windows. The building is heated using a combination of under-floor and radiator heating as... Continue Reading »

The Weald School Sixth Form Centre

The project was constructed in an area through which staff and pupils had to pass to gain access to the school, management of health and safety was paramount to ensure that deliveries did not disrupt the pick up point for the school coaches located immediately outside the site gates. The... Continue Reading »

Manhood Community College

We were responsible for the construction of a new music and drama facility, and connection into the existing building. Access to the site was via the school drive and onto a playing field. The building was completed on time and within the original tender budget. Continue Reading »